Setting Up Your First EPS Cutting Machine: Installation & First Cut
Before the machine arrives
Reserve a level floor with clear access, a stable single-phase or three-phase supply (check the nameplate), and ventilation for fumes — see our dust and fume FAQ. Keep a fire extinguisher within reach from day one.
Installation checklist
- Level the frame. A twisted frame bows the wire and ruins accuracy (our tolerances FAQ).
- Confirm power and earth. Wrong voltage damages the transformer and wire supply.
- Thread and tension the wire. No slack, no kinks.
- Load the control software. Test jog axes before any cut.
Your first cut
Start with a scrap block and a simple rectangle. Set a low density program, watch the edge, then raise to your production density using the density and speed guide. Measure the part, adjust feed, repeat until on tolerance.
Commissioning sign-off
A new EPS Cutting Machine is “ready” only after a clean, measured first cut on your real density. Take the measurement seriously — it sets the baseline for every batch after.