Setting Up Your First EPS Cutting Machine: Installation & First Cut

Before the machine arrives

Reserve a level floor with clear access, a stable single-phase or three-phase supply (check the nameplate), and ventilation for fumes — see our dust and fume FAQ. Keep a fire extinguisher within reach from day one.

Installation checklist

  • Level the frame. A twisted frame bows the wire and ruins accuracy (our tolerances FAQ).
  • Confirm power and earth. Wrong voltage damages the transformer and wire supply.
  • Thread and tension the wire. No slack, no kinks.
  • Load the control software. Test jog axes before any cut.

Your first cut

Start with a scrap block and a simple rectangle. Set a low density program, watch the edge, then raise to your production density using the density and speed guide. Measure the part, adjust feed, repeat until on tolerance.

Commissioning sign-off

A new EPS Cutting Machine is “ready” only after a clean, measured first cut on your real density. Take the measurement seriously — it sets the baseline for every batch after.