EPS Pre-expander in France

Client & Project Background

ISOLFRANCE SARL, located in Meaux, France, serves the construction sector. The client needed higher pre-expander capacity with lower energy use.

Challenge

The client’s old intermittent pre-expander produced 15 g/L density bead at about 900 kg/h – a capacity ceiling that constrained downstream block molding.

Equipment Supplied

Equipment Spec / Qty
EPS Pre-expander Machine SPJY2000 x 2

Results & Benefits

At 15 g/L density, the two SPJY2000 pre-expanders deliver about 1800 kg/h – capacity roughly doubled versus the old machine. The machine’s built-in energy-saving design also substantially lowers power consumption per ton of pre-expanded bead.

Implementation Timeline

  • Contract signed: August 2018
  • Equipment shipped: 15 October 2018
  • Arrived: 30 November 2018
  • Commissioning completed: 15 December 2018

Client Feedback

The client confirmed the doubled capacity removed the bottleneck ahead of block molding and cut energy cost per ton.